Change of the site plan of the west side of Hirvaskanka

To prepare for the improvements to Highway 4, advanced to the surroundings of Hirvaskanka. The aim of the scheme is to enable the improvements to be made to highway 4 and the implementation of parallel roads.

Formula steps

Decision on starting zoning on December 2.12.2024, XNUMX
Commencement announcement 11.12.2024 June XNUMX
Decision on displaying the draft plan, City Board 13.1.2025
The draft plan can be seen on 22.1. - 21.2.2025 June XNUMX

Plan draft material, available for viewing 22.1.2025 - 21.2.2025

Plan draft map

Formula explanation

Appendix 1 Participation and evaluation plan

Appendix 2 Station plan monitoring form (at the proposal stage)

Appendix 3 Draft road plan maps

Appendix 4 Highway 4 Vehniä – Äänekoski road plan nature studies 2023 & 2024

Appendix 5 Hirvimäki town plan environmental assessment 2012

Appendix 6 Interaction report (at the proposal stage)

Form for giving an opinion


Past stages

Getting started material

Participation and evaluation plan 

Form for giving feedback

Pending formulas