Change of the site plan of the west side of Hirvaskanka
To prepare for the improvements to Highway 4, advanced to the surroundings of Hirvaskanka. The aim of the scheme is to enable the improvements to be made to highway 4 and the implementation of parallel roads.
Formula steps
Decision on starting zoning on December 2.12.2024, XNUMX
Commencement announcement 11.12.2024 June XNUMX
Decision on displaying the draft plan, City Board 13.1.2025
The draft plan can be seen on 22.1. - 21.2.2025 June XNUMX
Plan draft material, available for viewing 22.1.2025 - 21.2.2025
Appendix 1 Participation and evaluation plan
Appendix 2 Station plan monitoring form (at the proposal stage)
Appendix 3 Draft road plan maps
Appendix 4 Highway 4 Vehniä – Äänekoski road plan nature studies 2023 & 2024
Appendix 5 Hirvimäki town plan environmental assessment 2012
Appendix 6 Interaction report (at the proposal stage)