Partial cancellation of the Henttalanmäki site plan, 992 15/9
The goal of the partial cancellation of the site plan is to enable the implementation of the connection solution to be drawn up for the Henttalanmäki factory area. Part of the road area and the light traffic route should be located in the protective green area (EV-8) indicated in the current site plan. The site plan is repealed in the necessary parts, so that it is possible to approve the road plan being prepared without limiting it.
However, the aim of the plan is not to expand the site plan as a basis for administrative decisions, as Äänekoskentie is already an area without site planning.
Plan proposal material, available 28.8.2024 - 13.9.2024
Appendix 1 Station plan monitoring form
Past stages
Plan draft material, Was available for viewing on 10.5. - 27.5.2024 May XNUMX
Form for giving an opinion about the formula